Canal-Side Lounge Renewal
Interior Finished Project
Canal-Side Lounge Renewal
Walls smoothed and repainted, oak floor sanded and oiled, and new dimmable lighting throughout — a full lounge refresh completed while the family stayed put.
- Duration
- 6 working days
- Crew
- 2 decorators + floor specialist
- Materials
- Low-VOC paint, hardwax oil
- Guarantee
- 2-year labour cover
On Site How It Went
From First Visit To Final Wipe-Down
Two kids, one dog and forty square metres of scuffed walls — this lounge needed armour, not just paint. We agreed washable low-VOC coatings in warm white, a sanded-and-oiled oak floor, and layered lighting the family could dim for film nights.
Walls were filled, sanded twice and finished in two coats; the floor was sanded back, oiled and left to cure over a weekend. New dimmers and two wall lights completed the scheme. The family stayed in the flat throughout — we sealed the room each evening and handed it back dust-free.
Step By Step The Work Plan
Exactly What We Did
Prep week: furniture moved to storage, floors and radiators sheeted, cracks raked and filled.
Walls and ceiling: mist coat, two top coats and a crisp white ceiling throughout.
Floor renewal: sand, vacuum, two coats of hardwax oil with a weekend cure.
Lighting and return: dimmers fitted, furniture back, full tidy-up and walkthrough.
"Two kids and a dog, and they still handed the room back spotless. The walls have survived eight months of chaos without a mark."