South Berlin Whole-Flat Repaint
Painting Finished Project
South Berlin Whole-Flat Repaint
An 85-square-metre flat repainted top to bottom — ceilings, walls, doors and radiators — with dust sheets on every surface and a full tidy-up each evening.
- Duration
- 8 working days
- Crew
- 3 decorators
- Materials
- Scrub-resistant matt emulsion
- Guarantee
- 2-year labour cover
On Site How It Went
From First Visit To Final Wipe-Down
Seven rooms, one hallway and eighty-five square metres of walls that had not seen a brush in a decade. The owners picked a calm palette — warm whites with a deep blue study wall — and scrub-resistant matt emulsion throughout so the finish would survive everyday life.
We worked room by room so the family always had somewhere to sleep: ceilings first, then walls, then doors and radiators in satin. Edges were cut by hand, not taped and hoped, and each room was vacuumed and polished before we moved on. The final walkthrough found two tiny touch-ups — both done on the spot.
Step By Step The Work Plan
Exactly What We Did
Room-by-room plan: one space at a time so the family could live around us.
Prep: sugar-soap wash, fill, sand and spot-prime every surface.
Top coats: ceilings, walls in two coats, then doors and radiators in satin.
Polish: vacuum, touch-ups on the spot and a signed room-by-room walkthrough.
"They painted around our lives for eight days and you would never know they had been here — except the flat looks brand new."